3051 Edison Way, North Fair Oaks CA

3051 Edison Way, North Fair Oaks CA

Developer Novin Development Corp.
Service Provider Housing Choices (IDD)
Mental Health Association of San Mateo County (PSH)
Target Population 25% intellectually and developmentally disabled
25% permanent supportive housing
50% general affordable housing
Affordability 30-50% AMI
Project Type New Construction
Site Area 0.54 Acre
Units Total of 70 units, including:

  • 50 units of 1BR
  • 20 units of 2BR
Density 130 units/acre
Project Status Full entitled under SB35
Service Offered
  • Case management
  • Resident services
Architect BAR Architects

Our 3051 Edison Way project is planned as a 70-unit (one 2-bedroom manager’s unit) income restricted affordable housing project. The site is located in the North Fair Oaks district of unincorporated San Mateo County and within the Redwood City sphere of influence. The site is within a highly walkable area of the North Fair Oaks district and approximately 1.5 miles from the existing Caltrain station and less than 1/8 mile from a regional bus stop with less than 20-minute headways. In addition, Costco, Target, and other retailers are less than ½ mile from the site.

The building is designed to serve households ranging from 15% to 60% AMI income levels, with 18 units set aside for adults with Intellectual and Developmental Disabilities (I/DD) and 18 units set aside for PSH residents who meet the HUD definition for homeless, the remaining 40 units are restricted to households at 60% AMI. The project is comprised of 50 one-bedroom units and 20 two-bedroom units. The structure will be six (6) stories tall with five levels of residential units over a concrete-podium parking garage. The project will be served by a central elevator, an onsite property manager, and a secure entrance. The development will include amenities, case worker offices, and well programed common area. Some of the amenities planned for the project include but will not be limited to a computer lab, a full kitchen with a dining area, TV lounge, and an outdoor deck. There are 28 car parking stalls, eight of which will include EV chargers, as well as 36 indoor bike parking spaces. As designed, the project will be built with Type III, over Type I podium.

Skills

Posted on

February 3, 2023